Far Reach Voyages.Com

"The longest journey begins with the first step . . ."

Home

Far Reach

Moving Far Reach

Bow Roof Shed

Gable Vents

Vapor Liner

Restoration

The Plan

The Deck

The Interior

The Hull

The Rig

Projects

Gutting the Interior

Rebuilding the Interior

Removing Deck Trim

Bowsprit Modification

Rudder/Tiller Project

Hull-Deck Joint

Deck/Topside Refinishing

Building the Bulwarks

Marking the Waterline

Below the Waterline

Bottom Paint

Propane Locker

Aft Watertight Compartmen

Water Tanks

ABI Windlass Rebuild

Refleks Heater

Cape Horn Windvane

Polishing Bronze

Installing Deck Hardware

Mast and Rigging

Daily Log

1 Jan 12 to Present

1 Dec 11 to 31 Dec 11

1 Oct 11 to 30 Nov 11

1 Aug 11 to 30 Sept 11

1 July 11 to 31 Jul 11

12 May 11 to 30 Jun 11

1 Apr 11 to 11 May 11

1 Jan 11 to 31 Mar 11

1 Oct 10 to 31 Dec 10

18 July 10 to 30 Sept 10

13 Apr 09 to 17 Jul 10

Tools

Library

Equip For Sale

Links

Writings

Musings

Sailing

Contact us

In an effort to group similar hull restoration projects together I have added links to separate project pages.  Click on the below link to go to the desired project:

- Rudder Project

- Through-Hull Project
  


 

© Copyright 2009 by Far Reach Designs.  No part of this site may be duplicated or used without the permission of Far Reach Designs.